SR 11-7 style flow: development, independent validation, approval, ongoing monitoring, periodic revalidation, and terminal exits
Guided views
Explore this system
Step through curated paths without changing the source diagram.
Beat
Next
ReadyChapter 01 / 01
Guided chapter
Diagram guideExplore this system
Inspecting compiled semantics
E ExportT ThemeS Style0 Reset+ Zoom in- Zoom outEsc Close
Find a node
⌕/
No matching nodes
Semantic passport
Verified source
Authored reach
Route probeChoose a start node
Pick two semantic nodes on the diagram
Choose the source, then the destination. Direction matters.
Semantic lensCompare system roles
Choose up to two semantic kinds. One reveals its real traffic; two compare only direct authored relationships.
Choose a kind to inspect its nodes and touching relationships.
Semantic radar
Building overview
Click nodeDrag to pan
Governance Rail
• One version moves through five ordered phases
• Independent validation is a distinct phase, not a checkbox
• Monitoring is an ongoing phase feeding revalidation
Gates + Alerts
• The approval gate can send a model back or reject it
• Monitoring raises drift alerts on threshold breach
• A flagged model recovers to the rail or is retired
Terminal Exits
• Rejected models never reach production
• Retired models are decommissioned with an audit trail
• Terminal exits do not point back into production use
Lifecycle diagram • Built with Archify • Create yours ↗ • Hover to trace • R route • Click to focus • +/− zoom • M radar • [/] views • P play story • T theme • E export