From mempool sighting to finalized credit, with reorg rollback and replaced-transaction re-evaluation
Guided views
Explore this system
Step through curated paths without changing the source diagram.
Beat
Next
ReadyChapter 01 / 01
Guided chapter
Diagram guideExplore this system
Inspecting compiled semantics
E ExportT ThemeS Style0 Reset+ Zoom in- Zoom outEsc Close
Find a node
⌕/
No matching nodes
Semantic passport
Verified source
Authored reach
Route probeChoose a start node
Pick two semantic nodes on the diagram
Choose the source, then the destination. Direction matters.
Semantic lensCompare system roles
Choose up to two semantic kinds. One reveals its real traffic; two compare only direct authored relationships.
Choose a kind to inspect its nodes and touching relationships.
Semantic radar
Building overview
Click nodeDrag to pan
Confirmed is a threshold
• Depth = tip − block_height + 1; mempool is depth 0
• No ledger credit posts before depth reaches N
• N scales with asset and deposit amount
Reorg rollback
• A block-hash mismatch at a known height signals a reorg
• Unconfirm posts a compensating entry, never a delete
• Withdrawals freeze while the credit is reversed
Re-evaluate the tx
• Re-mined or back in mempool climbs toward N again
• A conflicting spend drops the deposit as terminal
• State is recomputed from the chain, so retries are idempotent
Lifecycle diagram • Built with Archify • Create yours ↗ • Hover to trace • R route • Click to focus • +/− zoom • M radar • [/] views • P play story • T theme • E export