Everything before this moment was preparation with an exit. Cutover is the moment traffic actually moves — reads, then writes, then trust — and its engineering question is blunt: how do you cross so that the first sign of trouble costs a flag-flip instead of an incident? The answer is incremental exposure, pre-staged rollback, and a disciplined patience about demolishing the bridge you just crossed.

Posts 2–4 built the new copy and proved it agrees; this post moves production onto it — the migrate phase’s final steps, executed with feature-flag discipline and post 4’s agreement rate as the admission ticket.

Reads first, and by percentage

Read cutover goes first because it’s the reversible half: serving reads from the new copy changes no data, so rollback is purely a routing decision. The mechanics: a flag, not a deploy — the read path selects old/new per request, controllable at runtime, because rollback-by-deploy measures in minutes while rollback-by-flag measures in seconds; ramped exposure — internal traffic, then 1%, 10%, 50%, 100%, each stage holding long enough to see real load shapes (including the daily peak — a cutover validated only at 3 a.m. traffic has been validated against nothing); cohort-sticky routing where consistency within a session matters — percentage by user/tenant, not by request, so one actor doesn’t straddle copies mid-session; and watch the comparative metrics — error rate, latency, and (the migration-specific one) the shadow-read mismatch rate from post 4, which during ramp becomes your live canary: mismatches rising with exposure means the cold copy has problems the hot sample missed. Any degradation: flip back, diagnose, re-ramp. Boring is the goal.

Writes second, and the asymmetry that changes everything

Write cutover — new copy becomes the written truth, old copy becomes the follower (reverse dual-write) or stops — carries the asymmetry that deserves respect: once writes land only in the new copy, “flip back” is no longer free, because the old copy is now the stale one. The disciplines that manage it: keep reverse dual-writes running (new → old) through the entire rollback window, so the old copy stays current and rollback remains a flag-flip — this is “keeping the bridge”; cut writes by cohort where the system allows (tenant-by-tenant write migration bounds any disaster to a cohort you can repair); and sequence the risky day deliberately — write cutover on a quiet morning with the team watching, not Friday 6 p.m., because while rollback is cheap, diagnosis still wants humans awake.

Rollback as a built thing, and the demolition date

The rollback plan that works is the one that was built, tested, and pre-staged — not the paragraph in the runbook. Concretely: the flags exist in both directions and have been exercised (flip to new, flip back, in staging and in the early ramp — a rollback path never tested is a hypothesis); the data story under rollback is explicit (with reverse dual-writes: none needed; without: a documented re-sync procedure with a measured duration); and the rollback window is declared — the period during which the old path is kept warm and return is cheap. The window ends deliberately: after N days at 100% with agreement sustained (post 4’s number, still running), the team crosses the real point of no return — stop reverse writes, decommission the old path, schedule the contract phase (post 2). Two traps on the way out: the forever-bridge (reverse dual-writes left running for months “just in case” — cost, complexity, and a false comfort that rots as the paths drift) and the premature demolition (dropping the old column in the same week as the write flip — the incidents this causes are the entire reason contract is a separate, dated, boring phase). The bridge exists to be kept exactly as long as declared, then demolished on schedule.

The takeaway: cutover is incremental exposure with a pre-staged exit — reads first (flag-controlled, percentage-ramped through real peaks, cohort-sticky, canaried by the live mismatch rate), writes second with the asymmetry respected (reverse dual-writes keep the old copy current, cohort-scoped flips bound the blast radius, quiet-morning scheduling keeps humans available), and rollback as a built, tested artifact with a declared window — after which the bridge is demolished on schedule, neither kept forever nor dropped in the flush of victory. Migrations end the way they were run: deliberately.

Key takeaways

Further reading