BCP for AI — forced-failure drills
Fallback agents plus a CI step that replaces the primary agent with one that always errors. If the fallback doesn't produce a usable answer, the PR can't merge.
Business Continuity Planning (BCP) ensures systems remain available during disruptions. Articles cover chaos engineering for multi-agent AI resilience, disaster recovery testing, and the planning practices that validate whether production systems actually survive the failure scenarios they were designed for.
1 post tagged with bcp. ← All posts
Fallback agents plus a CI step that replaces the primary agent with one that always errors. If the fallback doesn't produce a usable answer, the PR can't merge.
All posts on this site are written by Pratik Dhanave, an Agentic AI Architect with 7+ years building production distributed systems, multi-agent AI platforms, and cloud-native infrastructure. About the author → Each article includes working code, architecture diagrams, and references to the specific frameworks and standards discussed. Browse all posts or explore related topics using the tag cloud above.